Airtable part 4: Construction of the framework

Now you're going to fix the air table center box with a surrounding framework, so it stands.

Step 1: U-formation framework

We will first build two U-shaped framework which will be connected to the airtable using the holes we prepared during the predrilling stage. Accordingly the central part of the "U" should be 480 mm. You can decide of the length of the other two elements that will become the feets of the table. We usually use 400 mm, and if should not be less than 250 mm to get enough distance for the camera fixed below.

Step 2: Fixing the U-formation framework to the central air table

In this set we will attach the frame (blue marked in the picture above) to the air table box.

Repeat this step with the second U-formation framework on the other side of the air table box.

Step 3: Attach a second frame circle

To guarantee a higher stability it's recommended to place a second framework circle 5-10cm above the ground. The second framework circle is shown in the picture below.

Picture of the second frame circle

Note

The following strut is only needed if you want to place the camera on it, it does not have a stability purpose


Previous page | Next page